SwePub
Sök i LIBRIS databas

  Utökad sökning

WFRF:(Mignon Ingrid)
 

Sökning: WFRF:(Mignon Ingrid) > Economic analysis o...

Economic analysis of the early market of centralized photovoltaic parks in Sweden

Lindahl, Johan, 1984 (författare)
Chalmers tekniska högskola,Chalmers University of Technology,Chalmers Univ Technol, Dept Technol Management & Econ, SE-41296 Gothenburg, Sweden.
Lingfors, David, PhD, 1987- (författare)
Uppsala universitet,Byggteknik och byggd miljö
Elmqvist, Åsa Katarina (författare)
Högskolan i Gävle,Besluts-, risk- och policyanalys,Univ Gävle, Fac Engn & Sustainable Dev, SE-80176 Gävle, Sweden.
visa fler...
Johansson Mignon, Ingrid, 1983 (författare)
Chalmers tekniska högskola,Chalmers University of Technology,Chalmers Univ Technol, Dept Technol Management & Econ, SE-41296 Gothenburg, Sweden.
visa färre...
 (creator_code:org_t)
Elsevier BV, 2022
2022
Engelska.
Ingår i: Renewable Energy. - : Elsevier BV. - 0960-1481 .- 1879-0682. ; 185, s. 1192-1208
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • Sweden is one of the countries that experience growing installation volumes of Solar photovoltaic. Traditionally, in Sweden, most of the solar photovoltaic investments and policy incentives have focused on distributed photovoltaic systems. Yet, despite limited policy incentives and pessimistic forecasts, an increasing number of centralized photovoltaic parks have been commissioned and plans for substantial new capacities are communicated. Hence, the current paper investigates why. Detailed information about the underlying costs of six PV parks commissioned in2019 and 2020 in Sweden were obtained by in-depth interviews with stakeholders and were analysed through levelized cost of electricity calculations. We conclude that the unsubsidised levelized cost of electricity ranged from 27.37 to 49.39 €/MWh, with an average of 40.79 €/MWh. This is lower than what are assessed for photovoltaic parks in some recent Swedish electricity system scenario studies. The main reason for the discrepancy is identified to be the assumed interest rates in the system scenario studies and the actual cost of capital experienced in the market. Comparing the levelized cost of electricity values with the market value of solar photovoltaic electricity on the spot market show that four of the six studied parks would be profitable under a merchant business model with the last years spot prices. If the downward price trend continues, Sweden may face an unexpected expansion of photovoltaic parks.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Maskinteknik -- Energiteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Mechanical Engineering -- Energy Engineering (hsv//eng)
SAMHÄLLSVETENSKAP  -- Annan samhällsvetenskap -- Tvärvetenskapliga studier inom samhällsvetenskap (hsv//swe)
SOCIAL SCIENCES  -- Other Social Sciences -- Social Sciences Interdisciplinary (hsv//eng)
SAMHÄLLSVETENSKAP  -- Ekonomi och näringsliv (hsv//swe)
SOCIAL SCIENCES  -- Economics and Business (hsv//eng)
TEKNIK OCH TEKNOLOGIER  -- Naturresursteknik -- Energisystem (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Environmental Engineering -- Energy Systems (hsv//eng)

Nyckelord

Levelized cost of electricity (LCOE)
Photovoltaics (PV)
Value factor
Merchant PV business Model
Centralized PV
Weighted average cost of capital (WACC)

Publikations- och innehållstyp

art (ämneskategori)
ref (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy