Model for economic replacement time of mining production rigs including redundant rig costs

Hamodi, Hussan (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
Lundberg, Jan (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
Al-Gburi, Majid (författare)
Luleå tekniska universitet,Byggkonstruktion och -produktion
visa fler...
Ahmadi, Alireza (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
Ghodrati, Behzad (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
visa färre...
 (creator_code:org_t)
2015
2015
Engelska.
Ingår i: Journal of Quality in Maintenance Engineering. - 1355-2511 .- 1758-7832. ; 21:2, s. 207-226
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • Purpose - This paper presents a practical model to determine the economic replacement time (ERT) of production machines. The objective is to minimise the total cost of capital equipment, where total cost includes acquisition, operating, maintenance costs and costs related to the machine’s downtime. The costs related to the machine’s downtime are represented by the costs of using a redundant machine. Design/methodology/approach - Four years of cost data are collected. Data is analysed, practical optimisation model is developed and regression analysis is done to estimate the drilling rigs ERT. The artificial neural network (ANN) technique is used to identify the effect of factors influencing the ERT of the drilling rigs.Findings - The results show that the redundant rig cost has the largest impact on ERT, followed by acquisition, maintenance and operating costs. The study also finds that increasing redundant costs per hour have a negative effect on ERT, while decreases in other costs have a positive effect. Regression analysis shows a linear relationship between the cost factors and ERT. Practical implications - The proposed approach can be used by the decision maker in determining the economic replacement time of production machines which used in mining industry.Originality/value - The research proposed in this paper provides and develops an optimisation model for economic replacement time of mining machines. This research also identifies and explains the factors that have the largest impact on the production machine’s ERT. This model for estimating the ERT has never been studied on mining drilling rigs.Keywords Decision support model, Life cycle cost, Optimisation, Replacement timePaper type Research paper

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Annan samhällsbyggnadsteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Other Civil Engineering (hsv//eng)

Nyckelord

Drift och underhållsteknik
Operation and Maintenance

Publikations- och innehållstyp

ref (ämneskategori)
art (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy