Lindroos, M. (författare)
Lund University,Lunds universitet,Partikel- och kärnfysik,Fysiska institutionen,Institutioner vid LTH,Lunds Tekniska Högskola,European Spallation Source ESS AB,Stiftelser och övriga anknutna verksamheter,Particle and nuclear physics,Department of Physics,Departments at LTH,Faculty of Engineering, LTH,Other Institutions and Utilities
Danared, H. (författare)
Lund University,Lunds universitet,European Spallation Source ESS AB,Stiftelser och övriga anknutna verksamheter,Other Institutions and Utilities
Garoby, R. (författare)
European Spallation Source ESS AB
visa fler...
Jansson, A. (författare)
Lund University,Lunds universitet,European Spallation Source ESS AB,Stiftelser och övriga anknutna verksamheter,Other Institutions and Utilities
Martins, C. (författare)
Lund University,Lunds universitet,European Spallation Source ESS AB,Stiftelser och övriga anknutna verksamheter,Other Institutions and Utilities
Ponton, A. (författare)
Eshraqi, M. (författare)
Lund University,Lunds universitet,European Spallation Source ESS AB,Stiftelser och övriga anknutna verksamheter,Other Institutions and Utilities
Levinsen, Y. I. (författare)
visa färre...
 (creator_code:org_t)
2016
2016
Engelska 5 s.
Ingår i: IPAC 2016 - Proceedings of the 7th International Particle Accelerator Conference. - 9783954501472 ; , s. 4266-4270
  • Konferensbidrag (refereegranskat)
Abstract Ämnesord
Stäng  
  • The construction of the European Spallation Source, ESS, started in summer 2014. At the site in Lund, the accelerator tunnel will be completed at the time of IPAC16, while prototyping and manufacturing or preparations for manpower contributions are going on in more 23 laboratories distributed over the 12 European countries collaborating on the accelerator project. Major technical milestones have been reached include the testing of superconducting cavity prototypes of two families to values above design gradients, the first ESS modulator has been tested to 90 kV and the first klystron prototype has been received in April 2016. Equally important developments are taking place at many partner laboratories. The presentation will summarize the status of the ESS accelerator project by the time of IPAC16.

Ämnesord

NATURVETENSKAP  -- Fysik -- Acceleratorfysik och instrumentering (hsv//swe)
NATURAL SCIENCES  -- Physical Sciences -- Accelerator Physics and Instrumentation (hsv//eng)

Publikations- och innehållstyp

kon (ämneskategori)
ref (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy