Procurement Requirements for Carbon Reduction in Infrastructure Construction Projects : An International Case Study

Kadefors, Anna, Professor, 1962- (författare)
KTH,Projektkommunikation
Uppenberg, Stefan (författare)
WSP
Alkan-Olsson, Johanna (författare)
Lunds universitet, Centre for Environmental and Climate Research
visa fler...
Balian, Daniel (författare)
WSP
Lingegård, Sofia (författare)
KTH,Vatten- och miljöteknik
visa färre...
 (creator_code:org_t)
ISBN 9789178731947
Stockholm : KTH Royal Institute of Technology, 2019
Engelska 118 s.
  • Rapport (övrigt vetenskapligt/konstnärligt)
Abstract Ämnesord
Stäng  
  • Executive SummaryIntroductionFollowing alarming reports from the IPCC, climate change has engaged policymakers world-wide to chart policies at different administrative levels to mitigate increasing greenhouse gas emissions. The construction sector causes a substantial part of all greenhouse gas emissions, primarily carbon dioxide. Traditionally in this sector, the focus of carbon reduction measures has been on improving the energy efficiency of buildings. Further, various sustainability assessment schemes (BREEAM, LEED, Green Star, etc.) have been developed to assess sustainability performance. More recently, awareness has increased of the considerable greenhouse gas emissions arising from the manufacturing of construction materials and components, and also from construction processes and transport. Consequently, the infrastructure construction sector is now considered as a major source of greenhouse gases. In the UK, The Infrastructure Carbon Review has estimated that the construction, maintenance and operations of infrastructure assets account for 16% of the nation’s total carbon dioxide emissions. It is widely acknowledged that these emissions need to be significantly reduced if the international and national reduction targets are to be met.About the projectThis research project has investigated the institutional and organisational contexts, policies, procurement requirements and implementation strategies used to drive greenhouse gas reduction in large infrastructure projects in five countries world-wide: Australia, The Netherlands, Sweden, the UK and the US (see below for an overview of case study projects). The study is based on interviews with key partners on the client side and in the supply chain of each project. To provide a contextual understanding of the strategies used in these projects, we further include descriptions of the policy background that underlies current strategies and ambitions. Thus, the project traces the pathway from political and organisational goals to actual realisation in projects.Overview of case studies in the Impres projectCountryImpres case studiesAustraliaSydney Metro NorthwestNewcastle Light RailThe NetherlandsMotorway A6 AlmereSwedenResults from the Swedish Transport Administration research project Control Station 2018 - an evaluation of carbon procurement requirements in Swedish infrastructure projects.UKHigh Speed 2Anglian Water (Grafham WTW Resilience and Dalton Piercy WTW) USACalifornia High-Speed RailSFO AirTrain Extension The title of this research project is Implementation of procurement requirements for sustainable collaboration in infrastructure projects, also referred to as Impres. The project is a collaboration between the engineering consultancy firm WSP, the KTH Royal Institute of Technology in Stockholm, Lund University and the construction company Skanska. The project is co-financed by Construction Climate Challenge (CCC), a sustainability research fund and network initiated by Volvo Construction Equipment, and the Swedish Research Council Formas. The latter funding comes through a grant for the Strong Research Environment ProcSIBE, Procurement for Sustainable Innovation in the Built Environment[1].We expect that results from this research project will be useful for decision-makers on the client side that are in charge of developing policies, procurement strategies and procurement requirements to reduce carbon emissions in the construction sector. Further, client and contractor project managers, environmental specialists and procurement staff responsible for implementing policies will be interested in experiences gained in similar initiatives in other countries. In parallel with this report, scientific articles are being developed by the authors to analyse and discuss the results described in this report more thoroughly in relation to other studies and to theory.ConclusionsIn all countries studied, there is an ongoing process to develop and implement policies for carbon reduction in infrastructure projects, with raised ambitions over time. In some cases, the development has initially been driven by a few dedicated individuals, but today there are frameworks and executive mandates in place that would make it hard to avoid carbon reduction commitments. National and regional reduction policies were found to be important in encouraging clients to develop ambitious carbon requirements that can contribute to setting new industry standards.Carbon reduction measures such as optimisation of constructions, minimised transport, reuse of excavated material and cement clinker replacement are applied in the studied cases. However, most of these measures are also cost efficient and would – or should – have been undertaken in a normal design and construction optimisation process. The positive side of this is that considerable carbon reductions may be achieved within existing budgets, and in most cases will even reduce cost, and that an increased focus on carbon may contribute to finding more such options. However, it also raises the question of what constitutes a relevant reference case, or baseline. Further, to meet the target levels of the Paris agreement, costly measures will also be needed, and this research identified only a few examples of such policies being implemented. Goals for carbon reduction are still new to many in the sector, and both clients and industry partners need time to adjust and develop new competencies. In countries with a longer history of carbon management, procurement strategies and requirements have advanced through continuous interaction between clients and industry actors over longer periods of time. Clients are wary of introducing requirements that may limit competition, and requirements to comply with rating schemes or to supply EPDs have been introduced successively to match the development of industry capacity. Award (MEAT) criteria related to carbon are used, but more often to increase awareness of carbon reduction rather than as a substantive basis for selection. Front-runner contractors and material suppliers were found to play important roles in reducing obstacles to innovation-oriented procurement. Moreover, the development of procurement requirements has been aligned with information and training initiatives, tool kits and guidelines to support low-carbon design and the calculation of emissions. In general, client environmental specialists have taken an active part in supporting the implementation of requirements in supply chains.Procurement requirements are considered important in driving carbon reductions in all countries, but the preferred style of these requirements vary. This diversity was partly related to general carbon management maturity and partly to general contracting practice and policy culture in the country or region. All countries used some form of contract-level reduction requirements, in most cases set in relation to a carbon emissions baseline. Overall, reduction requirements are perceived to encourage innovation, but our results show that such requirements were often more complex than foreseen and associated with administrative costs. First, to produce change and avoid speculation it is important to set requirements and incentives at the right level, which requires awareness on the client side of both the supplier’s competence and of the opportunities for carbon reduction in the specific project. Also, sharp requirements call for equally sharp and transparent performance evaluation. Moreover, much time was spent on calculation and re-calculation of baselines which could detract from measures for actual reduction of carbon emissions. In effect, time constraints in the projects limited the opportunities to involve subcontractors and material suppliers, which meant that all possible reductions were not realised. We conclude that expectations for substantial and innovative carbon reductions through functional reduction requirements may be too high. To influence sub-contractors and suppliers directly, several clients use specific requirements.Collaborative contracting models are a flexible option to encourage innovation and integrate knowledge of different participants. Many interviewees state the importance of breaking silo-thinking and integrating the supply chain in order to reach greater carbon reductions. Also, long-term alliances allow for continuous learning and more transformational innovation, including incentivising contractors to find ways of fulfilling client goals while building less. However, it should be emphasised that strong client leadership and commitment are essential both to legitimise collaborative contracting models and to achieve more fundamental behavioural change within collaborative projects and alliance schemes.Clients in mega-projects perceive an obligation to conform to national policy goals and may also have ambitions to be industry-level change agents. Since such projects have vast budgets, last for long periods of time and engage highly competent firms and individuals, they are often expected to show high performance in the area of innovation. However, mega-projects have many goals to fulfil, are technically and organisationally complex and associated with high risks. Therefore, time and willingness to develop new ways of working or implement new technology may be lacking. Further, even large projects may not be long enough to encompass processes to develop, test and approve new solutions. Thus, to support more efficient innovation processes in the industry, a long-term system perspective is needed. Interviewees suggested using smaller pilot projects for quicker testing of new materials, tools and technologies and, once proven, use procurement requirements in large projects to implement these more widely in the market.Overall, the study shows that the applicability of procurement requirements for carbon reduction is dependent on how well these requirements are aligned

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering (hsv//eng)

Nyckelord

procurement
carbon reduction
infrastructure
construction
sustainability
megaprojects
policy
public
upphandling
koldioxid
klimat
infrastruktur
byggande
hållbarhet
styrmedel
offentlig upphandling
Real Estate and Construction Management
Fastigheter och byggande

Publikations- och innehållstyp

vet (ämneskategori)
rap (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy